Today I took another day off of my bill paying job, last vacation of my anniversary year and spent a better part of the morning on the phone with them, bad timing I guess but good for the aquaponics. I spent this morning moving the equipment in to the house and I thank my love wife and gardening partner for giving me a space in the kitchen to set this stuff up.
Drilled out one of the shelves so that I can run the drain through the decking to where the tank will be. Moved the bed and tank to the shelves and plumbed out the whole thing. Here are a few photos.
 |
| Drain and hole |
 |
| Drain with aeriator |
 |
| Flow control valve |
 |
| Water line in and grow media (Hydrocorn) |
 |
| Extended Tank fill with Aerator and tank |
No comments:
Post a Comment